Demolition of 12 Flats at Borland Avenue, Carlisle.


We were contracted by GBS to soft strip and demolish 12 flats at Borland Avenue, Carlisle.

Using our own in house team of interior strippers and specialist demolition plant we completed this project on time and within budget for our client. 

J&S Plant (Cumbria) Ltd © .  ALL RIGHTS RESERVED.

 

 

WWW.CUMBRIAPLANTHIRE.COM

WWW.PLANTHIRECUMBRIA.CO.UK

Earthworks at Marchon, Whitehaven.


We were contracted by Fox (Owmby) Ltd to carry out earthworks at Marchon to rectify a failed tip liner.

We stripped the soils on the failed liner and the slipped batter, reinstated the liner, reduced the gradient of the batter by creating an armoured rock wall around the toe of the batter and reinstated the soils.

This work was carried out by our own operatives to within our clients specification and under budget.